top of page
leeds_slider.jpeg

POWERSTATION-LEEDS

Timber Construction – excellent

The waste incineration plant in Leeds takes place in a visually appealing setting, almost a “living façade”. The plant is made of a glulam structure roofed by curved arches. The construction with a length of 123.5m but a height of 42m and a width of only 34m, presented an immense static challenge.

Location: Leeds, Great Britain
Building Developer: Joint Venture CNIM/Clugston
Architekt: Jean-Robert Mazaud, S’pace Architects, Paris

42 meter high, 123 meter length und 35 meter width

ca. 2.600 m³ BSH

EINBLICKE IN DIE ARBEITEN DER POWERSTATION

PICTURES OF POWERSTATION WORKS

WHY BAUCON

At Baucon we know that excellent work can only be done with a great team effort. In our team we all work hard and we are pulling in the same direction. The experience, passion and reliability of our employees are reflected in our incredible results –  we are proud of that.

CONTACT

Ingo Schmitz

Executive Partner

Tel.: +49 (0) 1712642351

E-Mail: ingo.schmitz@baucon-online.com

L+S BAUCON GMBH 

Switzerland

Bahnhofstraße 6CH-9001 St.Gallen

L+S BAUCON GMBH 

Germany

Am Stockweg 3

04668 Grimma

L+S BAUCON GMBH

Germany

Frohsinnstraße 15 

63739 Aschaffenburg

BAUCON POLSKA 

Poland

Aleja Bojaterów Warszawy 34/35

70-340 Szczecin

L+S BAUCON GMBH 

Germany

Kufürstendamm 14 

10719 Berlin

D&S BAUCON Ltd.

Ireland

Suite 302 Q-House,  

76 Furze Road, 

Sandyford Business Park,

Dublin D18 WC60

AWARD WINNING

The wooden structures created through our participation are unique and meet the highest standards - for this reason, these projects are regularly awarded with awards.

Winner of winners Award.jpg
Structural Timber Awards 2023 Baucon.png
2025 ST Awards WINNER Installer.jpg

© 2024 BAUCON GMBH

bottom of page